Flexible yard crane scheduling for mixed railway and road container operations in sea-rail intermodal ports with the sharing storage yard
| Year of publication: |
2024
|
|---|---|
| Authors: | Liu, Wenqian ; Xiaoning, Zhu ; Wang, Li ; Li, Siyu |
| Published in: |
Transportation research : an international journal. - Oxford : Pergamon, Elsevier Science, ISSN 1878-5794, ZDB-ID 2013782-5. - Vol. 190.2024, Art.-No. 103714, p. 1-24
|
| Subject: | Crane scheduling | Mixed container flow management | Sea-rail intermodal ports | Train time windows | Two-stage heuristic algorithm | Containerterminal | Container terminal | Scheduling-Verfahren | Scheduling problem | Kran | Crane | Containerverkehr | Container transport | Intermodaler Verkehr | Intermodal transport | Hafen | Port | Heuristik | Heuristics | Algorithmus | Algorithm | Schienenverkehr | Railway transport | Hafenanlagen | Port facilities | Logistikzentrum | Logistics centre |
-
Liu, Wenqian, (2025)
-
RMG vs DRMG : an evolution of different crane configurations in intermodal transshipment yards
Kellner, Michael, (2015)
-
Li, Bing, (2022)
- More ...
-
Liu, Wenqian, (2025)
-
Yan, Baicheng, (2020)
-
Modeling and analyzing of railway container hub scheduling system based on multi-agent system
Wang, Li, (2013)
- More ...