Flow shop scheduling to minimize the total completion time with a permanently present operator : models and ant colony optimization metaheuristic
| Year of publication: |
2011
|
|---|---|
| Authors: | Li, Xiangyong ; Baki, Mohammed Fazle ; Aneja, Yash P. |
| Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 38.2011, 1, p. 152-164
|
| Subject: | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Durchlaufzeit | Lead time | Evolutionärer Algorithmus | Evolutionary algorithm | Algorithmus | Algorithm | Theorie | Theory |
-
Minimising makespan in distributed assembly hybrid flowshop scheduling problems
Ying, Kuo-Ching, (2025)
-
Bi-objective hybrid flow shop scheduling with common due date
Li, Zhi, (2021)
-
Parallel machine scheduling with multiple processing alternatives and sequence-dependent setup times
Kim, Jun, (2021)
- More ...
-
An ant colony optimization metaheuristic for machine : part cell formation problems
Li, Xiangyong, (2010)
-
Tabu search and iterated local search for the cyclic bottleneck assignment problem
Li, Xiangyong, (2018)
-
Li, Xiangyong, (2017)
- More ...