Green scheduling of a two-machine flowshop : trade-off between makespan and energy consumption
Year of publication: |
1 February 2016
|
---|---|
Authors: | Mansouri, S. Afshin ; Aktas, Emel ; Besikci, Umut |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 249.2016, 3 (1.2.), p. 772-788
|
Subject: | Green scheduling | Sustainable manufacturing | Multi-objective optimization | Sequence-dependent setup times | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem | Energiekonsum | Energy consumption | Nachhaltige Entwicklung | Sustainable development | Heuristik | Heuristics | Evolutionärer Algorithmus | Evolutionary algorithm | Algorithmus | Algorithm | Umweltmanagement | Environmental management |
-
Zandi, Arash, (2020)
-
Green permutation flowshop scheduling problem with sequence-dependent setup times : a case study
Ramezanian, Reza, (2019)
-
Iori, Manuel, (2023)
- More ...
-
Minimizing energy consumption and makespan in a two-machine flowshop scheduling problem
Mansouri, S. Afshin, (2016)
-
Geng, Ruoqi, (2017)
-
Geng, Ruoqi, (2017)
- More ...