Heuristics and lower bound for minimizing maximum lateness on a batch processing machine with incompatible job families
Year of publication: |
2019
|
---|---|
Authors: | Li, XiaoLin ; Li, Yupeng ; Huang, YanLi |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 106.2019, p. 91-101
|
Subject: | Batch processing machine | Heuristics | Maximum lateness | Lower bound | Job families | Heuristik | Scheduling-Verfahren | Scheduling problem | Produktionssteuerung | Production control | Theorie | Theory | Rechnerbetrieb | Computer operations |
-
Zhou, Shengchao, (2014)
-
Ozturk, Onur, (2012)
-
An adaptive penalty guided genetic algorithm for scheduling parallel batch processing machines
Xu, Shubin, (2018)
- More ...
-
Scheduling unrelated parallel batch processing machines with non-identical job sizes
Li, XiaoLin, (2013)
-
Minimising makespan on a batch processing machine using heuristics improved by an enumeration scheme
Li, XiaoLin, (2017)
-
Towards product evolution : from the perspective of user knowledge
Li, Yupeng, (2023)
- More ...