//-->
Maximising profit for multiple-product, single-period, single-machine manufacturing under sequential set-up constraints that depend on lot size
Trigos, Federico, (2016)
Production scheduling for strategic open pit mine planning : a mixed-integer programming approach
Rivera Letelier, Orlando, (2020)
Beam Search Heuristics for the Single Machine Scheduling Problem with Linear Earliness and Quadratic Tardiness Costs
Valente, Jorge M. S., (2010)
Heuristics for the single machine scheduling problem with early and quadratic tardy penalties
Valente, Jorge M. S., (2007)
An exact approach for the single machine scheduling problem with linear early and quadratic tardy penalties
Valente, Jorge M. S., (2008)
BEAM SEARCH HEURISTICS FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH LINEAR EARLINESS AND QUADRATIC TARDINESS COSTS
VALENTE, JORGE M. S., (2009)