Heuristics for an integrated maintenance and production scheduling problem on parallel machines with stochastic failures and non-resumable jobs
Year of publication: |
[2015]
|
---|---|
Authors: | Hoyningen-Huene, Wiebke von |
Publisher: |
[Kiel : Institut für Betriebswirtschaftslehre, Universität Kiel] |
Subject: | Parallel Machine Scheduling | Maintenance | Stochastic Failures | Non-Resumable Jobs | Ant Colony System | Scheduling-Verfahren | Scheduling problem | Instandhaltung | Maintenance policy | Heuristik | Heuristics | Durchlaufzeit | Lead time | Produktionsplanung | Production planning | Theorie | Theory | Stochastischer Prozess | Stochastic process | Algorithmus | Algorithm |
Extent: | Online-Ressource (35 S.) graph. Darst. |
---|---|
Series: | |
Type of publication: | Book / Working Paper |
Type of publication (narrower categories): | Graue Literatur ; Non-commercial literature |
Language: | English |
Notes: | Systemvoraussetzungen: Acrobat Reader |
Other identifiers: | hdl:10419/112746 [Handle] |
Source: | ECONIS - Online Catalogue of the ZBW |
-
Maintenance and production scheduling on a single machine with stochastic failures
Hoyningen-Huene, Wiebke von, (2015)
-
Hoyningen-Huene, Wiebke von, (2015)
-
Solving parallel machine problems with delivery times and tardiness objectives
Maecker, Söhnke, (2020)
- More ...
-
Hoyningen-Huene, Wiebke von, (2015)
-
Maintenance and production scheduling on a single machine with stochastic failures
Hoyningen-Huene, Wiebke von, (2015)
-
Hoyningen-Huene, Wiebke von, (2015)
- More ...