//-->
A portofolio model for component purchasing strategy and the case study of the South Korean elevator manufacturers
Lee, Dong Myung, (2010)
Scheduling of machines and automated guided vehicles in FMS using differential evolution
Gnanavel Babu, A., (2010)
The impact of flexibility on engineer-to-order production planning
Brachmann, Robert, (2021)
Résolution d'un problème d'ordonnancement avec la PLC
Baptiste, Pierre, (1996)
Constraint-based model for the cyclic multi-hoists scheduling problem
Manier, Marie-Ange, (2000)