Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system
Year of publication: |
1-15 March 2017
|
---|---|
Authors: | Kang, Chang Wook ; Ullah, Misbah ; Sarkar, Biswajit ; Hussain, Iftikhar ; Akhtar, Rehman |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 55.2017, 5/6 (1/15.3.), p. 1748-1766
|
Subject: | Work-in-process | random defects | lot size | rework | Losgröße | Lot size | Theorie | Theory | Produktionssteuerung | Production control | Produktionssystem | Manufacturing system | Lagerhaltungsmodell | Inventory model |
-
Lot sizing in a deteriorating production system under inspections, imperfect maintenance and reworks
Chakraborty, T., (2014)
-
Bouslah, Bassem, (2013)
-
An integrated producer-buyer relationship in the environment of EMQ and JIT production systems
Das Roy, Monami, (2012)
- More ...
-
Kwon, Hyukchun, (2019)
-
Impact of the Coronavirus disease 2019 and the post-pandemic construction sector (Pakistan)
Ayat, Muhammad, (2022)
-
Ayat, Muhammad, (2020)
- More ...