Incorporation of resource reliability into critical chain project management buffer sizing
Year of publication: |
2020
|
---|---|
Authors: | Zarghami, Seyed Ashkan ; Gunawan, Indra ; Zubielqui, Graciela Corral de ; Baroudi, Bassam |
Subject: | Buffer sizing | critical chain project management | project scheduling | resource reliability | Projektmanagement | Project management | Scheduling-Verfahren | Scheduling problem | Engpass | Bottleneck |
-
Resource-constrained project scheduling with concave processing rate functions
Steeneck, Daniel W., (2015)
-
Resource-constrained multi-project scheduling problem : a survey
Gómez Sánchez, Mariam, (2023)
-
Buffer sizing approach with dependence assumption between activities in critical chain scheduling
Bie, Li, (2012)
- More ...
-
The emergence and evolution of reliability theory for water distribution networks
Zarghami, Seyed Ashkan, (2020)
-
Entropy of centrality values for topological vulnerability analysis of water distribution networks
Zarghami, Seyed Ashkan, (2019)
-
The four Rs performance indicators of water distribution networks : A review of research literature
Gunawan, Indra, (2017)
- More ...