Increasing production rate in Kanban controlled assembly lines through preventive maintenance
| Year of publication: |
2012
|
|---|---|
| Authors: | Ruifeng, Chen ; Subramaniam, Velusamy |
| Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 4 (15.2.), p. 991-1008
|
| Subject: | assembly line | decomposition | Kanban | Markov | preventive maintenance | unreliable machine | Instandhaltung | Maintenance policy | Fließfertigung | Assembly-line production | Just in Time | Just in time | Markov-Kette | Markov chain | Produktionssystem | Manufacturing system | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Produktionssteuerung | Production control |
-
Azzi, Anna, (2012)
-
Guo, Weihong, (2020)
-
A Note on "Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems"
Kubiak, Wieslaw, (2017)
- More ...
-
Performance evaluation for tandem multi-factory supply chains : an approximate solution
Ruifeng, Chen, (2011)
-
A WIP control policy for tandem lines
Subramaniam, Velusamy, (2009)
-
A WIP control policy for tandem lines
Subramaniam, Velusamy, (2009)
- More ...