Increasing the output of mixed-model assembly lines for industrialised housebuilding : learnings from a case-based simulation study
| Year of publication: |
2025
|
|---|---|
| Authors: | Grenzfurtner, Wolfgang ; Pichler, Elena ; Gronalt, Manfred |
| Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 63.2025, 9, p. 3192-3207
|
| Subject: | bottleneck analysis | discrete event simulation | industrialised housebuilding | Mixed-model assembly line | offsite construction | prefabricated housebuilding | Simulation | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem | Industrialisierung | Industrialization | Engpass | Bottleneck | Theorie | Theory |
-
Tiacci, Lorenzo, (2015)
-
Tiacci, Lorenzo, (2015)
-
Tannady, Hendy, (2018)
- More ...
-
Grenzfurtner, Wolfgang, (2020)
-
Gartner, Maria Anna, (2023)
-
Produktionsplanung und -steuerung in der Elektronikmontage : mit 58 Tabellen
Gronalt, Manfred, (1998)
- More ...