Industrial multi-resource flexible job shop scheduling with partially necessary resources
Year of publication: |
2025
|
---|---|
Authors: | Perrachon, Quentin ; Olteanu, Alexandru-Liviu ; Sevaux, Marc ; Fréchengues, Sylvain ; Kerviche, Jean-François |
Published in: |
European journal of operational research : EJOR. - Amsterdam [u.a.] : Elsevier, ISSN 0377-2217, ZDB-ID 1501061-2. - Vol. 320.2025, 2 (16.1.), p. 309-327
|
Subject: | Flexible job shop | Metaheuristics | Multi-resource | Partially necessary resources | Scheduling | Scheduling-Verfahren | Scheduling problem | Produktionssteuerung | Production control | Theorie | Theory | Heuristik | Heuristics | Flexibles Fertigungssystem | Flexible manufacturing system |
-
A research survey : review of flexible job shop scheduling techniques
Chaudhry, Imran Ali, (2016)
-
Birgin, Ernesto Julian Goldberg, (2015)
-
Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops
Rohaninejad, Mohammad, (2016)
- More ...
-
Integrating preferences within multiobjective flexible job shop scheduling
Bezoui, Madani, (2023)
-
Makboul, Salma, (2025)
-
Thuillier, Owein, (2024)
- More ...