Integrated crew organization and work zone scheduling for network-wide daily road pavement rehabilitation
Year of publication: |
2025
|
---|---|
Authors: | Zhang, Wenyi ; He, Yanbo ; Zhang, Xuan ; Liu, Tao ; Guan, Wei |
Published in: |
European journal of operational research : EJOR. - Amsterdam [u.a.] : Elsevier, ISSN 0377-2217, ZDB-ID 1501061-2. - Vol. 320.2025, 2 (16.1.), p. 290-308
|
Subject: | Day-to-day traffic dynamics | Hybrid heuristics | Pavement maintenance | Project scheduling | Work zone scheduling | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Projektmanagement | Project management | Instandhaltung | Maintenance policy | Theorie | Theory | Personaleinsatzplanung | Crew scheduling | Straßenbau | Road construction |
-
A tabu search heuristic for building aircraft maintenance personnel rosters
De Bruecker, Philippe, (2014)
-
An analysis of generalised heuristics for vehicle routing and personnel rostering problems
Mısır, Mustafa, (2015)
-
A Tabu Search Heuristic for Building Aircraft Maintenance Personnel Rosters
De Bruecker, Philippe, (2014)
- More ...
-
Zhang, Wenyi, (2019)
-
He, Dongdong, (2023)
-
Microscopic driving theory with oscillatory congested states: Model and empirical verification
Tian, Junfang, (2015)
- More ...