Integrated production systems : design, planning, control, and scheduling
Year of publication: |
1991 ; 4. ed., 1. [Dr.]
|
---|---|
Other Persons: | Mabert, Vincent A. (contributor) |
Publisher: |
Norcross, Ga. : Industrial Engineering and Management Pr., Inst. of Industrial Engineers |
Subject: | Fertigung | Automation | Produktionsplanung | Produktionssystem |
Description of contents: | Table of Contents [digitool.hbz-nrw.de] |
-
(1992)
-
Banfield, Thomas Charles, (1969)
-
Retrograde Terminierung, ein Ansatz zu verbesserter Fertigungssteuerung bei Werkstattfertigung
Adam, Dietrich, (1987)
- More ...
-
Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis
Dumond, John, (1988)
-
A Simulation Analysis of Tour-Shift Construction Procedures
Mabert, Vincent A., (1982)
-
Cyclical Schedules for Capacitated Lot Sizing with Dynamic Demands
Campbell, Gerard M., (1991)
- More ...