Integrated scheduling of production and delivery with time windows
Year of publication: |
2013
|
---|---|
Authors: | Low, Chinyao ; Li, Rong-kwei ; Chang, Chien-min |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 51.2013, 3 (1.2.), p. 897-909
|
Subject: | adaptive operation | genetic algorithm | integrated scheduling | time windows | vehicle route | Tourenplanung | Vehicle routing problem | Scheduling-Verfahren | Scheduling problem | Evolutionärer Algorithmus | Evolutionary algorithm | Heuristik | Heuristics | Terminplanung | Time scheduling | Theorie | Theory |
-
Implicit time windows and multi-commodity mixed-fleet vehicle routing
Schönberger, Jörn, (2017)
-
A biased random key genetic algorithm for the field technician scheduling problem
Damm, Ricardo B., (2016)
-
Yang, Jun, (2025)
- More ...
-
Coordination of production scheduling and delivery problems with heterogeneous fleet
Low, Chinyao, (2014)
-
Integrated scheduling of production and delivery with time windows
Low, Chinyao, (2013)
-
Coordination of production scheduling and delivery problems with heterogeneous fleet
Low, Chinyao, (2014)
- More ...