Irreversible investments with delayed reaction: an application to generation re-dispatch in power system operation
Year of publication: |
2014
|
---|---|
Authors: | Perninge, Magnus ; Söder, Lennart |
Published in: |
Mathematical Methods of Operations Research. - Springer. - Vol. 79.2014, 2, p. 195-224
|
Publisher: |
Springer |
Subject: | Delayed reaction | Irreversible investment | Impulse control | Numerical solution | Power system operation | Reflected BSDE | Snell envelope |
-
Perninge, Magnus, (2014)
-
Pricing Asset Scheduling Flexibility using Optimal Switching
Carmona, Rene, (2008)
-
A limited-feedback approximation scheme for optimal switching problems with execution delays
Perninge, Magnus, (2018)
- More ...
-
Perninge, Magnus, (2014)
-
A limited-feedback approximation scheme for optimal switching problems with execution delays
Perninge, Magnus, (2018)
-
A finite horizon optimal switching problem with memory and application to controlled SDDEs
Perninge, Magnus, (2020)
- More ...