Joint optimisation for dynamic flexible job-shop scheduling problem with transportation time and resource constraints
Year of publication: |
2022
|
---|---|
Authors: | Ren, Weibo ; Yan, Yan ; Hu, Yaoguang ; Guan, Yu |
Subject: | dynamic flexible job-shop scheduling | hybrid algorithm | production efficiency | transportation constraints | Scheduling-Verfahren | Scheduling problem | Algorithmus | Algorithm | Flexibles Fertigungssystem | Flexible manufacturing system | Heuristik | Heuristics | Produktionssteuerung | Production control | Durchlaufzeit | Lead time |
-
Fekih, Asma, (2020)
-
Corominas, Albert, (2019)
-
Birgin, Ernesto Julian Goldberg, (2015)
- More ...
-
Ren, Weibo, (2021)
-
Measuring the performance of knowledge resources using a value perspective: integrating BSC and ANP
Hu, Yaoguang, (2015)
-
Measuring the performance of knowledge resources using a value perspective : integrating BSC and ANP
Hu, Yaoguang, (2015)
- More ...