Joint optimization of flexible job shop scheduling and preventive maintenance under high-frequency production switching
| Year of publication: |
2024
|
|---|---|
| Authors: | Wang, Yu ; Xia, Tangbin ; Xu, Yuhui ; Ding, Yutong ; Zheng, Meimei ; Pan, Ershun ; Xi, Lifeng |
| Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier Science, ISSN 1873-7579, ZDB-ID 2020829-7. - Vol. 269.2024, Art.-No. 109163, p. 1-22
|
| Subject: | Flexible job shop scheduling | Preventive maintenance | High-frequency production switching | Variable operating conditions | Hybrid meta-heuristics algorithm | Scheduling-Verfahren | Scheduling problem | Instandhaltung | Maintenance policy | Produktionssteuerung | Production control | Theorie | Theory | Algorithmus | Algorithm | Heuristik | Heuristics | Flexibles Fertigungssystem | Flexible manufacturing system |
-
Yuan, Shuai, (2025)
-
Hadda, Hatem, (2015)
-
Sekma, Nahla Chabbah, (2024)
- More ...
-
Zheng, Meimei, (2023)
-
Zheng, Meimei, (2024)
-
Supplier selection problem for multiple projects with uncertain demand and project life cycles
Zheng, Meimei, (2021)
- More ...