Level scheduling under limited resequencing flexibility
| Year of publication: |
2010
|
|---|---|
| Authors: | Boysen, Nils ; Fliedner, Malte ; Scholl, Armin |
| Institutions: | Wirtschaftswissenschaftliche Fakultät, Friedrich-Schiller-Universität Jena |
| Subject: | Mixed-model assembly line | Just-in-Time | Level Scheduling | Re-Sequencing | Engineering |
-
Level Scheduling for batched JIT supply
Boysen, Nils, (2009)
-
Determining the size of a mix bank in a mixed-model assembly line
Ito, Ryojiro, (2018)
-
Peng, Yunfang, (2024)
- More ...
-
Sequencing mixed-model assembly lines: Survey, classification and model critique
Boysen, Nils, (2007)
-
Solving symmetric mixed-model multi-level just-in-time scheduling problems
Fliedner, Malte, (2008)
-
Production Planning of Mixed-Model Assembly Lines: Overview and Extensions
Boysen, Nils, (2007)
- More ...