Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint
| Year of publication: |
2009
|
|---|---|
| Authors: | Sung, Chang Sup ; Juhn, Jaeho |
| Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 119.2009, 2, p. 392-401
|
| Subject: | Fließfertigung | Assembly-line production | Fertigbau | Prefabricated building | Outsourcing | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Branch-and-Bound | Branch and Bound | Algorithmus | Algorithm |
-
A two-stage three-machine assembly scheduling problem with deterioration effect