Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint
Year of publication: |
2009
|
---|---|
Authors: | Sung, Chang Sup ; Juhn, Jaeho |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 119.2009, 2, p. 392-401
|
Subject: | Fließfertigung | Assembly-line production | Fertigbau | Prefabricated building | Outsourcing | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Branch-and-Bound | Branch and Bound | Algorithmus | Algorithm |
-
A two-stage three-machine assembly scheduling problem with a position-based learning effect
Wu, Chin-Chia, (2018)
-
A two-stage three-machine assembly scheduling problem with deterioration effect
Wu, Chin-Chia, (2019)
-
Talens, Carla, (2024)
- More ...
-
Sung, Chang Sup, (2009)
-
Sung, Chang Sup, (2009)
-
Sung, Chang Sup, (2009)
- More ...