Material handling considerations in the FMS loading problem with full routing flexibility
Year of publication: |
2012
|
---|---|
Authors: | Koşucuoǧlu, Deniz ; Bilge, Ümit |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 22 (15.11.), p. 6530-6552
|
Subject: | facility layout | FMS | materials handling | metaheuristics | Flexibles Fertigungssystem | Flexible manufacturing system | Materialfluss | Material flow | Heuristik | Heuristics | Tourenplanung | Vehicle routing problem | Fabrikplanung | Facility layout |
-
Loop-based facility layout design under flexible bay structures
Asef-Vaziri, Ardavan, (2017)
-
Sukhotu, Vatcharapol, (2012)
-
Robust facility layout design for flexible manufacturing : a doe-based heuristic
Pourvaziri, Hani, (2022)
- More ...
-
Multi-mode resource constrained multi-project scheduling and resource portfolio problem
Beşikci, Umut, (2015)
-
Mathematical models for FMS loading and part type selection with flexible process plans
Bilge, Ümit, (2015)
-
Operational aircraft maintenance routing problem with remaining time consideration
Başdere, Mehmet, (2014)
- More ...