Mathematical modelling and a meta-heuristic for flexible job shop scheduling
| Year of publication: |
2013
|
|---|---|
| Authors: | Roshanaei, V. ; Azab, Ahmed ; ElMaraghy, Hoda A. |
| Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 51.2013, 20 (15.10.), p. 6247-6274
|
| Subject: | scheduling | flexible job shop | mixed integer linear programming | hybrid artificial immune algorithms | simulated annealing | size complexity | optimality gap | Scheduling-Verfahren | Scheduling problem | Mathematische Optimierung | Mathematical programming | Theorie | Theory | Heuristik | Heuristics | Produktionssteuerung | Production control | Algorithmus | Algorithm |
-
Ozturk, Onur, (2017)
-
Solving parallel machine problems with delivery times and tardiness objectives
Maecker, Söhnke, (2020)
-
De Moerloose, Pieter, (2023)
- More ...
-
ElMaraghy, Hoda A., (2012)
-
Multi-period additive/subtractive product platform design and inventory management
Moussa, Mostafa, (2022)
-
Adaptive cognitive manufacturing system (ACMS) : a new paradigm
ElMaraghy, Hoda A., (2022)
- More ...