Mathematical models and heuristics for double-load crane scheduling in slab yards
Year of publication: |
2025
|
---|---|
Authors: | Dong, Zixiong ; Che, Ada ; Feng, Jianguang |
Published in: |
European journal of operational research : EJOR. - Amsterdam [u.a.] : Elsevier, ISSN 0377-2217, ZDB-ID 1501061-2. - Vol. 324.2025, 3 (1.8.), p. 773-786
|
Subject: | Crane scheduling | Double-load operation | Heuristic | Mixed integer linear programming | Slab yard | Heuristik | Heuristics | Scheduling-Verfahren | Scheduling problem | Kran | Crane | Mathematische Optimierung | Mathematical programming | Containerterminal | Container terminal | Theorie | Theory |
-
Ding, Yi, (2023)
-
Scheduling multiple yard cranes with crane interference and safety distance requirement
Wu, Yong, (2015)
-
Dayama, Niraj Ramesh, (2014)
- More ...
-
Energy-efficient unrelated parallel machine scheduling with general position-based deterioration
Wang, Yusheng, (2023)
-
Feng, Jianguang, (2014)
-
Robust optimization for the cyclic hoist scheduling problem
Che, Ada, (2015)
- More ...