Minimizing total completion time and makespan for a multi-scenario bi-criteria parallel machine scheduling problem
Year of publication: |
2025
|
---|---|
Authors: | Zhang, Xiechen ; Angel, Eric ; Chu, Feng ; Regnault, Damien |
Published in: |
European journal of operational research : EJOR. - Amsterdam [u.a.] : Elsevier, ISSN 0377-2217, ZDB-ID 1501061-2. - Vol. 321.2025, 2 (1.3.), p. 397-406
|
Subject: | Approximation algorithm | Identical parallel machines | Multi-criteria | Scheduling | Uncertainty | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Algorithmus | Algorithm | Theorie | Theory | Heuristik | Heuristics | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Branch-and-Bound | Branch and Bound |
-
Wang, Xiuli, (2015)
-
Minimizing the makespan on two identical parallel machines with mold constraints
Chung, Tsuiping, (2019)
-
Ozturk, Onur, (2017)
- More ...
-
Yu, Yugang, (2012)
-
A relax-and-fix method for clothes inventory balancing scheduling problem
Wang, Shijin, (2023)
-
Liu, Ming, (2023)
- More ...