Minimizing total flow time in a two-machine flow shop with limited waiting time constraint and ready time in a semiconductor fabrication plant
Year of publication: |
December 2017
|
---|---|
Authors: | Choi, Seong-Woo |
Published in: |
International journal of operations and quantitative management : IJOQM. - Houston, Tex. : INFOMS, ISSN 1082-1910, ZDB-ID 1290624-4. - Vol. 23.2017, 4, p. 317-325
|
Subject: | Scheduling | Flow shop | Limited Waiting Time | Ready Time | Total Flow Time | Heuristic | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Durchlaufzeit | Lead time | Terminplanung | Time scheduling | Warteschlangentheorie | Queueing theory | Algorithmus | Algorithm | Zeit | Time |
-
Arik, Oğuzhan Ahmet, (2023)
-
Total completion time with markespan constraint in no-wait flowshops with setup times
Allahverdi, Ali, (2014)
-
An, Young-Jin, (2016)
- More ...
-
Minimizing total tardiness on a two-machine re-entrant flowshop
Choi, Seong-Woo, (2009)
-
Minimizing total tardiness on a two-machine re-entrant flowshop
Choi, Seong-Woo, (2009)
-
Minimizing makespan on an m-machine re-entrant flowshop
Choi, Seong-Woo, (2008)
- More ...