Minimizing the weighted sum of maximum earliness and maximum tardiness in a single-agent and two-agent form of a two-machine flow shop scheduling problem
| Year of publication: |
2022
|
|---|---|
| Authors: | Nasrollahi, Vahid ; Moslehi, Ghasem ; Reisi-Nafchi, Mohammad |
| Published in: |
Operational research : an international journal. - Berlin : Springer, ISSN 1866-1505, ZDB-ID 2425760-6. - Vol. 22.2022, 2, p. 1403-1442
|
| Subject: | Flow shop | Maximum earliness | Maximum tardiness | Number of tardy jobs | Two-agent scheduling | Scheduling-Verfahren | Scheduling problem | Branch-and-Bound | Branch and Bound | Heuristik | Heuristics | Fließfertigung | Assembly-line production | Algorithmus | Algorithm | Produktionsplanung | Production planning | Durchlaufzeit | Lead time |
-
A two-stage three-machine assembly scheduling problem with deterioration effect
Wu, Chin-Chia, (2019)
-
A two-stage three-machine assembly scheduling problem with a position-based learning effect
Wu, Chin-Chia, (2018)
-
Talens, Carla, (2024)
- More ...
-
Rajaei, Maryam, (2022)
-
The multiple container loading problem with loading docks
Rajaei, Maryam, (2024)
-
Akbarzadeh, Babak, (2019)
- More ...