//-->
Clustering-based solution approach for a capacitated lot-sizing problem on parallel machines with sequence-dependent setups
Larroche, François, (2022)
Parallel machine scheduling with time constraints on machine qualifications
Nattaf, Margaux, (2019)
Flow shop batching and scheduling with sequence-dependent setup times
Shen, Liji, (2014)
Greedy algorithms and metaheuristics for a multiple runway combined arrival-departure aircraft sequencing problem
Hancerliogullari, G., (2013)
Generalized spanning trees
Dror, M., (2000)