//-->
Cost impact of float loss on a project with adjustable activity durations
Lo, W., (2013)
The project scheduling problem with non-deterministic activities duration : a literature review
Ortiz-Pimiento, Nestor Raul, (2018)
Optimal project duration for resource leveling
Atan, Tankut, (2018)