Modelling and solving algorithm for two-stage scheduling of construction component manufacturing with machining and welding process
| Year of publication: |
1-15 October 2018
|
|---|---|
| Authors: | Meng, Ronghua ; Rao, Yunqing ; Zheng, Yun ; Qi, Dezhong |
| Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 56.2018, 19 (1/15.10.), p. 6378-6390
|
| Subject: | construction component manufacturing | job-shop scheduling | makespan | harmony search algorithm | local search | Algorithmus | Algorithm | Scheduling-Verfahren | Scheduling problem | Produktionssteuerung | Production control | Durchlaufzeit | Lead time | Bauwirtschaft | Construction industry |
-
An improved Intelligent Water Drops algorithm for achieving optimal job-shop scheduling solutions
Niu, S. H., (2012)
-
Huang, Ying-Ying, (2023)
-
Li, Jun-qing, (2012)
- More ...
-
Modeling and solving for bi-objective cutting parallel machine scheduling problem
Meng, Ronghua, (2020)
-
Rao, Yunqing, (2020)
-
Hybrid-biased genetic algorithm for packing unequal rectangles into a fixed-size circle
Luo, Qiang, (2024)
- More ...