Multi-mode resource constrained multi-project scheduling and resource portfolio problem
Year of publication: |
2015
|
---|---|
Authors: | Beşikci, Umut ; Bilge, Ümit ; Ulusoy, Gündüz |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 240.2015, 1, p. 22-31
|
Publisher: |
Elsevier |
Subject: | Project scheduling | Resource portfolio problem | Multi-project scheduling | Resource dedication | Resource preference |
-
Multi-mode resource constrained multi-project scheduling and resource portfolio problem
Beşikci, Umut, (2015)
-
New summary measures and datasets for the multi-project scheduling problem
Van Eynde, Rob, (2022)
-
Simultaneous structuring and scheduling of multiple projects with flexible project structures
Hoffmann, Luise-Sophie, (2020)
- More ...
-
Multi-mode resource constrained multi-project scheduling and resource portfolio problem
Beşikci, Umut, (2015)
-
Mathematical models for FMS loading and part type selection with flexible process plans
Bilge, Ümit, (2015)
-
Bilge, Ümit, (1997)
- More ...