Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies
| Year of publication: |
April 2017
|
|---|---|
| Authors: | Zoraghi, Nima ; Shahsavar, Aria ; Abbasi, Babak ; Van Peteghem, Vincent |
| Published in: |
Top : transactions in operations research. - [Berlin] : Springer, ISSN 1134-5764, ZDB-ID 1205918-3. - Vol. 25.2017, 1, p. 49-79
|
| Subject: | Project scheduling | Multi-mode resource-constrained | Material ordering | Particle swarm optimization | Genetic algorithm | Simulated annealing | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Projektmanagement | Project management | Evolutionärer Algorithmus | Evolutionary algorithm | Mathematische Optimierung | Mathematical programming | Heuristik | Heuristics | Engpass | Bottleneck |
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2017)
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2018)
-
Bredael, Dries, (2023)
- More ...
-
A metaheuristic solution approach for the time-constrained project scheduling problem
Verbeeck, Cédric, (2017)
-
An artificial immune system for the multi-mode resource-constrained project scheduling problem
Van Peteghem, Vincent, (2009)
-
A genetic algorithm for the multi-mode resource-constrained project scheduling problem
Van Peteghem, Vincent, (2008)
- More ...