Multi-objective biased randomised iterated greedy for robust permutation flow shop scheduling problem under disturbances
Year of publication: |
2020
|
---|---|
Authors: | Al-Behadili, Mohanad ; Ouelhadj, Djamila ; Jones, Dylan |
Published in: |
Journal of the Operational Research Society. - London : Taylor and Francis, ISSN 1476-9360, ZDB-ID 2007775-0. - Vol. 71.2020, 11, p. 1847-1859
|
Subject: | Biased Randomised Iterated Greedy | multi-objective optimisation model | Particle Swarm Optimisation | Permutation flow shop scheduling | predictive-reactive approach | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Heuristik | Heuristics | Mathematische Optimierung | Mathematical programming | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Durchlaufzeit | Lead time |
-
Shen, Jing-nan, (2016)
-
Jafarzadeh, Hassan, (2017)
-
Li, Xiangtao, (2017)
- More ...
-
Bi-objective optimisation model for installation scheduling in offshore wind farms
Irawan, Chandra Ade, (2017)
-
Optimisation of maintenance routing and scheduling for offshore wind farms
Irawan, Chandra Ade, (2017)
-
Obal, Thalita Monteiro, (2019)
- More ...