Multi-objective meta-heuristics to solve three-stage assembly flow shop scheduling problem with machine availability constraints
Year of publication: |
2015
|
---|---|
Authors: | Shoaardebili, Niloofar ; Fattahi, Parviz |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 53.2015, 3 (1.2.), p. 944-968
|
Subject: | assembly flow shop | non-dominated sorting genetic algorithm | simulated annealing | multi-objective optimisation | machine availability constraint | Scheduling-Verfahren | Scheduling problem | Evolutionärer Algorithmus | Evolutionary algorithm | Heuristik | Heuristics | Produktionssteuerung | Production control | Fließfertigung | Assembly-line production | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Durchlaufzeit | Lead time | Produktionsplanung | Production planning |
-
Ren, Weibo, (2021)
-
Zhang, Sicheng, (2020)
-
Mozdgir, A., (2013)
- More ...
-
Tajbakhsh, Zahra, (2014)
-
A stochastic model for the cell formation problem considering machine reliability
Esmailnezhad, Bahman, (2015)
-
A Compromise Programming Model to Integrated Urban Water Management
Fattahi, Parviz, (2010)
- More ...