Multi-objective production scheduling with controllable processing times and sequence-dependent setups for deteriorating items
| Year of publication: |
2012
|
|---|---|
| Authors: | Karimi-Nasab, M. ; Fatemi Ghomi, S. M. T. |
| Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 24 (15.12.), p. 7378-7400
|
| Subject: | controllable processing time | deteriorating items | multi-objective | Pareto-optimal solutions | production scheduling | sequence-dependent setups. | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Produktionssteuerung | Production control | Prozessmanagement | Business process management | Produktionsplanung | Production planning |
-
New efficient heuristics for scheduling open shops with makespan minimization
Abreu, Levi Ribeiro de, (2022)
-
Controlling work in process during semiconductor assembly and test operations
Zhang, Chuwen, (2017)
-
Influencing factors of synchronization in manufacturing systems
Chankov, Stanislav, (2018)
- More ...
-
The causal relationship among electricity consumption, economic growth and capital stock in Iran
Salmanzadeh-Meydani, N., (2019)
-
Alamatsaz, Kayhan, (2021)
-
A two-sided Bernoulli-based CUSUM control chart with autocorrelated observations
Fatemi Ghomi, S. M. T., (2019)
- More ...