New exact and approximation algorithms for integrated production and transportation scheduling with committed delivery due dates and order acceptance
Year of publication: |
2023
|
---|---|
Authors: | Li, Feng ; Xu, Shifu ; Xu, Zhou |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 306.2023, 1 (1.4.), p. 127-140
|
Subject: | Scheduling | Integrated production and transportation | Commit-to-delivery | Order acceptance | Exact and approximation algorithms | Scheduling-Verfahren | Scheduling problem | Algorithmus | Algorithm | Heuristik | Heuristics | Produktionsplanung | Production planning |
-
Dynamic order acceptance and scheduling problem with sequence-dependent setup time
Xu, Lei, (2015)
-
Exact algorithms for a joint order acceptance and scheduling problem
Li, Xin, (2020)
-
A multi-agent resource bidding algorithm for order acceptance and assembly job shop scheduling
Abbaas, Omar, (2024)
- More ...
-
JD Operates Through Chinese New Year - Will This Be Tmall's Waterloo?
Guo, Pengfei, (2020)
-
Integrated production and transportation scheduling with order-dependent inventory holding costs
Yang, Xianyan, (2021)
-
Production and transportation integration for commit-to-delivery mode with general shipping costs
Li, Feng, (2020)
- More ...