No-wait flowshop scheduling problem with two criteria : total tardiness and makespan
| Year of publication: |
1 September 2018
|
|---|---|
| Authors: | Allahverdi, Ali ; Aydilek, Harun ; Aydilek, Asiye |
| Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 269.2018, 2 (1.9.), p. 590-601
|
| Subject: | Scheduling | No-wait | Flowshop | Makespan | Total tardiness | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Evolutionärer Algorithmus | Evolutionary algorithm | Heuristik | Heuristics | Operations Research | Operations research | Branch-and-Bound | Branch and Bound |
-
Detienne, Boris, (2016)
-
Krishnaraj, J., (2012)
-
Wang, Jian-Jun, (2015)
- More ...
-
Minimising maximum tardiness in assembly flowshops with setup times
Aydilek, Asiye, (2017)
-
Aydilek, Asiye, (2013)
-
Aydilek, Asiye, (2015)
- More ...