//-->
Solution algorithms for synchronous flow shop problems with two dominating machines
Kampmeyer, Matthias, (2016)
An efficient hybrid algorithm for integrated order batching, sequencing and routing problem
Chen, Tzu-Ji, (2015)
A worker constrained flexible job shop scheduling problem with sequence-dependent setup times
Kress, Dominik, (2019)
Nash equilibria in competitive project scheduling
Averbakh, Igor, (2010)
The pairwise flowtime network construction problem
Averbakh, Igor, (2021)
The minmax regret permutation flow-shop problem with two jobs
Averbakh, Igor, (2006)