On the integrated charge planning with flexible jobs in primary steelmaking processes
Year of publication: |
2010
|
---|---|
Authors: | Dong, Hongyu ; Huang, Min ; Ip, W. H. ; Wang, Xingwei |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 48.2010, 21/22 (1/15.11.), p. 6499-6535
|
Subject: | Stahlindustrie | Steel industry | Metallurgie | Metallurgy | Produktionssteuerung | Production control | Mathematische Optimierung | Mathematical programming | Heuristik | Heuristics | Algorithmus | Algorithm |
-
Ozturk, Onur, (2017)
-
A two-stage real world serial batching scheduling problem : a case study
Karakutuk, Sadik Serhat, (2024)
-
Tutumlu, Busra, (2023)
- More ...
-
On the integrated charge planning with flexible jobs in primary steelmaking processes
Dong, Hongyu, (2010)
-
Dong, Hongyu, (2012)
-
Dong, Hongyu, (2012)
- More ...