Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems
Year of publication: |
1986
|
---|---|
Authors: | Moily, Jaya P. |
Published in: |
Management Science. - Institute for Operations Research and the Management Sciences - INFORMS, ISSN 0025-1909. - Vol. 32.1986, 1, p. 113-125
|
Publisher: |
Institute for Operations Research and the Management Sciences - INFORMS |
Subject: | inventory/production: deterministic models | production/scheduling: flow shop | inventory/production: multi-stage lot sizing |
-
Saboo, S., (1989)
-
Flow Shop Problems with Time Lags
Szwarc, Wlodzimierz, (1983)
-
A New Approach to Determine Parameter Sensitivities of Transfer Lines
Ho, Y. C., (1983)
- More ...
-
Optimal and heuristic lot-sizing procedures for multi-stage manufacturing systems
Moily, Jaya P., (1982)
-
Optimal and heuristic procedures for component lot-splitting in multi-stage manufacturing systems
Moily, Jaya P., (1986)
-
Procedures for determining relative frequencies of production/order in multistage assembly systems
Moily, Jaya P., (1987)
- More ...