Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line
Year of publication: |
2011
|
---|---|
Authors: | Tamura, Takayoshi ; Okumura, Taiji ; Dhakar, Tej S. ; Ohno, Katsuhisa |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 49.2011, 14 (15.7.), p. 4299-4315
|
Subject: | Fließfertigung | Assembly-line production | Produktdifferenzierung | Product differentiation | Mehrproduktfertigung | Multiproduct production | Scheduling-Verfahren | Scheduling problem | Branch-and-Bound | Branch and Bound |
-
The multiproduct parallel assembly lines balancing problem : model and optimization procedure
Scholl, Armin, (2008)
-
On the two-stage assembly flow shop problem
Hadda, Hatem, (2024)
-
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times
Jeong, BongJoo, (2014)
- More ...
-
Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line
Tamura, Takayoshi, (2011)
-
Tamura, Takayoshi, (1999)
-
Tamura, Takayoshi, (1999)
- More ...