Optimal time phasing and periodicity for MRP with POQ policy
Year of publication: |
2011
|
---|---|
Authors: | Louly, Mohamed-Aly ; Dolgui, Alexandre |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 131.2011, 1, p. 76-86
|
Subject: | Fließfertigung | Assembly-line production | Materialfluss | Material flow | Vorleistungen | Intermediate goods | Durchlaufzeit | Lead time | Bestellung | Order | Algorithmus | Algorithm |
-
Louly, Mohamed-Aly, (2012)
-
A novel meta-heuristic algorithm for multi-objective dynamic facility layout problem
Hosseini, Seyed Shamsodin, (2016)
-
Chauhan, Satyaveer S., (2009)
- More ...
-
Optimal time phasing and periodicity for MRP with POQ policy
Louly, Mohamed-Aly, (2011)
-
Louly, Mohamed-Aly, (2013)
-
Louly, Mohamed-Aly, (2012)
- More ...