Optimisation of idle time of a critical machine and material processing time of a flow shop
Year of publication: |
2016
|
---|---|
Authors: | Pugazhenthi, R. ; Xavior, M. Anthony |
Published in: |
International journal of enterprise network management. - Olney, Bucks. : Inderscience Enterprises Ltd., ISSN 1748-1252, ZDB-ID 2212020-8. - Vol. 7.2016, 2, p. 98-112
|
Subject: | material processing time | critical machine | heuristic | shop floor | idle time | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Konsumentenverhalten | Consumer behaviour | Produktionssteuerung | Production control | Theorie | Theory |
-
A heuristic to minimise the idle time of the rental/critical machine in a flowshop
Pugazhenthi, R., (2015)
-
Wang, Xiuli, (2015)
-
Minimizing total completion time on a single machine with step improving jobs
Kim, Eun-Seok, (2015)
- More ...
-
A heuristic to minimise the idle time of the rental/critical machine in a flowshop
Pugazhenthi, R., (2015)
-
Baskar, A., (2022)
-
Evaluating the machinability of Ti-6AI-4V using coated carbide inserts
Vinayagamoorthy, R., (2016)
- More ...