Optimisation of yard crane scheduling considering velocity coefficient and preventive maintenance
Year of publication: |
2014
|
---|---|
Authors: | Ghomi, M. S. Fatemi Ghomi ; Javanshir, H. ; Ganji, S. S. ; Fatemi Ghomi, S. M. T. |
Published in: |
International journal of shipping and transport logistics : IJSTL. - Genéve [u.a.] : Inderscience Enterprises, ISSN 1756-6517, ZDB-ID 2540122-1. - Vol. 6.2014, 1, p. 88-108
|
Subject: | container terminal | yard cranc scheduling | YCS | mixed integer programming | MIP | particle swarm optimisation | PSO | simulated annealing | SA | Containerterminal | Container terminal | Scheduling-Verfahren | Scheduling problem | Kran | Crane | Instandhaltung | Maintenance policy | Ganzzahlige Optimierung | Integer programming | Simulation | Containerverkehr | Container transport | Heuristik | Heuristics | Mathematische Optimierung | Mathematical programming |
-
Ding, Yi, (2023)
-
Sequencing dual-spreader crane operations : mathematical formulation and heuristic algorithm
Lashkari, Shabnam, (2017)
-
Msakni, Mohamed Kais, (2018)
- More ...
-
Alamatsaz, Kayhan, (2021)
-
Jenabi, M., (2022)
-
Mosadegh, H., (2017)
- More ...