Optimising distributed heterogeneous flowshop group scheduling arising from PCB mounting : integrating construction and improvement heuristics
Year of publication: |
2025
|
---|---|
Authors: | Han, Zhenduo ; Zhang, Biao ; Sang, Hongyan ; Lu, Chao ; Meng, Leilei ; Zou, Wenqiang |
Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 63.2025, 5, p. 1753-1778
|
Subject: | artificial bee colony | construction-based heuristic | Distributed flowshop scheduling | group scheduling | tardiness | Heuristik | Heuristics | Scheduling-Verfahren | Scheduling problem | Evolutionärer Algorithmus | Evolutionary algorithm |
-
Zhang, Biao, (2024)
-
Flowshop sequence-denpendent group scheduling with minimisation of weighted earliness and tardiness
Keshavarz, Taha, (2019)
-
Scheduling distributed flowshops with flexible assembly and set-up time to minimise makespan
Zhang, Guanghui, (2018)
- More ...
-
Wang, Weiwei, (2024)
-
Zhang, Biao, (2024)
-
More MILP models for hybrid flow shop scheduling problem and its extended problems
Meng, Leilei, (2020)
- More ...