Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work
Year of publication: |
2020
|
---|---|
Authors: | Zhang, Yuan ; Yuan, Jinjiang ; Ng, Chi To ; Cheng, Tai Chiu E. |
Published in: |
Naval Research Logistics (NRL). - Wiley, ISSN 1520-6750, ZDB-ID 1465691-7. - Vol. 68.2020, 3 (17.11.), p. 378-393
|
Publisher: |
Wiley |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
Li, Shisheng, (2011)
-
Scheduling deteriorating jobs with CON/SLK due date assignment on a single machine
Li, Shisheng, (2011)
-
Fu, Ruyan, (2013)
- More ...