Particle swarm optimisation algorithm and multi-start simulated annealing algorithm for scheduling batches of parts in multi-cell flexible manufacturing system
Year of publication: |
2019
|
---|---|
Authors: | Balaji, A. N. ; Porselvi, S. ; Jawahar, N. |
Published in: |
International journal of services and operations management. - Olney : Inderscience, ISSN 1744-2370, ZDB-ID 2186492-5. - Vol. 32.2019, 1, p. 83-129
|
Subject: | flow shop scheduling | batch availability model | BAM | job availability model | JAM | flexible manufacturing system | FMS | particle swarm optimisation algorithm | multi start simulated annealing algorithm | Algorithmus | Algorithm | Flexibles Fertigungssystem | Flexible manufacturing system | Scheduling-Verfahren | Scheduling problem | Simulation | Heuristik | Heuristics | Theorie | Theory | Produktionssteuerung | Production control |
-
Corominas, Albert, (2019)
-
Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping
Hasani, Ali, (2022)
-
A Variable Neighborhood Search Enhance Genetic Algorithm for Flexible Job-Shop Scheduling Problem
Liu, Jianjun, (2023)
- More ...
-
Porselvi, S., (2018)
-
Solving fixed charge transportation problem with truck load constraint using metaheuristics
Balaji, A. N., (2019)
-
Sundar, R., (2019)
- More ...