Post-disaster multi-period road network repair: work scheduling and relief logistics optimization
Year of publication: |
2019
|
---|---|
Authors: | Li, Shuanglin ; Teo, Kok Lay |
Published in: |
Application of operations research (OR) in disaster relief operations (DRO), part I and part II. - New York, NY, USA : Springer. - 2019, p. 1345-1385
|
Subject: | Natural disasters | Road network repair work scheduling | Relief logistics | Bi-level programming | Maximum relative satisfaction degree | Steady-state parallel genetic algorithm | Wenchuan earthquake | Katastrophe | Disaster | Humanitäre Hilfe | Humanitarian aid | Logistik | Logistics | Erdbeben | Earthquake | Evolutionärer Algorithmus | Evolutionary algorithm | Scheduling-Verfahren | Scheduling problem | Instandhaltung | Maintenance policy | Lieferkette | Supply chain | Logistikunternehmen | Logistics provider | Mathematische Optimierung | Mathematical programming | Tourenplanung | Vehicle routing problem |
-
Integrated optimal scheduling of repair crew and relief vehicle after disaster
Shin, Youngchul, (2019)
-
Khanchehzarrin, Saeed, (2022)
-
Mishra, Bhupesh Kumar, (2022)
- More ...
-
Zhang, Dezhi, (2024)
-
Special issue: Nonconvex optimization in control
Teo, Kok Lay, (2002)
-
Teo, Kok Lay, (2005)
- More ...