Real-time bi-objective personnel re-scheduling in the retail industry
Year of publication: |
2021
|
---|---|
Authors: | Hassani, Rachid ; Desaulniers, Guy ; Elhallaoui, Issmail |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 293.2021, 1 (16.8.), p. 93-108
|
Subject: | Bi-objective | Labeling heuristic | Real-time re-scheduling | Scheduling | Einzelhandel | Retail trade | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Theorie | Theory |
-
Bi-objective reentrant hybrid flowshop scheduling : an iterated Pareto greedy algorithm
Ying, Kuo-ching, (2014)
-
Shen, Jing-nan, (2016)
-
A new heuristic-based bi-objective simulated annealing method for U-shaped assembly line balancing
Fathi, Masood, (2016)
- More ...
-
Real-time personnel re-scheduling after a minor disruption in the retail industry
Hassani, Rachid, (2020)
-
A parallel ruin and recreate heuristic for personnel scheduling in a flexible working environment
Hassani, Rachid, (2024)
-
Parallel stimulation of disruptions for personnel scheduling in a flexible working environment
Hassani, Rachid, (2021)
- More ...