Reduction of carbon emissions and project makespan by a Pareto-based estimation of distribution algorithm
Year of publication: |
2015
|
---|---|
Authors: | Zheng, Huan-yu ; Zhou, Gang |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 164.2015, p. 421-432
|
Subject: | Low-carbon production | Project scheduling | Estimation of distribution algorithm | Probability model | Multi-objective optimization | Treibhausgas-Emissionen | Greenhouse gas emissions | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Algorithmus | Algorithm | Projektmanagement | Project management | Durchlaufzeit | Lead time | Evolutionärer Algorithmus | Evolutionary algorithm | Wahrscheinlichkeitsrechnung | Probability theory |
-
Wang, Ling, (2013)
-
Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem
Barghi, Behrad, (2022)
-
Wang, Shengyao, (2013)
- More ...
-
Zheng, Huan-yu, (2015)
-
An effective teaching-learning-based optimisation algorithm for RCPSP with ordinal interval numbers
Zheng, Huan-yu, (2015)
-
Shen, Jing-nan, (2016)
- More ...