Rescheduling of unrelated parallel machines with job-dependent setup times under forecasted machine breakdown
Year of publication: |
2021
|
---|---|
Authors: | Kim, Young-In ; Kim, Hyun-Jung |
Subject: | fuzzy logic controller | machine breakdowns | Rescheduling | simulated-annealing | unrelated parallel machines | Scheduling-Verfahren | Scheduling problem | Fuzzy-Set-Theorie | Fuzzy sets | Durchlaufzeit | Lead time | Algorithmus | Algorithm | Produktionssteuerung | Production control |
-
Wang, Shengyao, (2013)
-
A meta-heuristic algorithm for the fuzzy assembly line balancing type-E problem
Zacharia, P. Th., (2013)
-
Li, Xuesong, (2015)
- More ...
-
Jeong, Hae-Yong, (2010)
-
Jeong, Hae-Yong, (2010)
-
M&A valuation for going concern: A case study using Samsung electronics’ adjusted EBITDA Multiple
Hong, Jee Woung, (2023)
- More ...